Overview
Location: Oberon, NSW
Industry: Manufacturing
As part of Australian Panels' commitment to being eco-friendly and environmentally sustainable, Crossmuller’s Electrical Division commenced work on installing a 4 Megawatt Gas Turbine Generator at the Oberon facility.
Before the installation could begin, a high-pressure gas pipeline and Gas Conditioning Station was installed. This station ensures the Turbine can access approximately 2000kPa supply of gas to run at maximum efficiency. The gas supply pipeline and pressure reduction station was completed within two years.