Overview
Division: Construction
Location: Wetherill Park
Industry: Recycling
The Crossmuller team were in charge of the installation of many aspects, including commissioning of the factory, offices and automation system, to name a few. Works included new consumers mains, MSB and DB installations, MCC installation for conveyor and machine control, factory/office power and lighting, emergency lighting, fire monitoring system, network and security infrastructure along with multideck weighbridge installation.
This facility is designed to turn drill mud and a number of other wastes such as stormwater and soils into highly-valued recycled aggregates suitable for reuse back in the construction industry.